Spec Finish Awards 2021
6 Buxton Crescent was built in the 1780s, but the Grade 1 listed building fell into disrepair and in 2003work began to convert it into a hotel and tourist attraction. The hotel now has 81 bedrooms and a spa featuring a refurbished Victorian pool filled with heated Buxton mineral water. In 2017, BWShrimpton was contracted by Vinci Construction to design, supply and install metal stud partitions, acoustic and decorative ceilings, plastering and fire protection work on this prestigious building. The works were originally scheduled to be completed within 12months, but the building’s deterioration, complexities and unique features meant the contract exceeded two and a half years, taking inmore than 100 different wall and ceiling types and hundreds of drawings and details. VALUE BAND Over £1m CONTRACT The Crescent Hotel and Spa, Buxton ARCHITECT ThinkCurious INTERIOR FIT-OUT BW Shrimpton bwshrimpton.co.uk CATEGORY SPONSOR Acknowledging the enormity of the task, the judges said: “BW Shrimptonmeticulously and painstakingly rebuilt the interiors of this dilapidated building by sympathetically integrating newworks and fire protectionmaterials into existing features. The Grade 1 listing restricted where and how the team could fix newmaterials, but a high degree of ingenuity, skill and collaboration resulted in a superb end result.” CONTRACTORS AWARDS2021 GOLDWINNER
Made with FlippingBook
RkJQdWJsaXNoZXIy Mzg1Mw==