Spec Finish Awards 2021

21 Barton Square was originally completed in 2007 as an open-air shopping centre alongside The Trafford Centre inManchester. This recent development, a £65m, 18-month project, involved glazing over the open courtyards andmalls, creating a 30m-high central glazed dome, and installing new floor, wall and ceiling finishes. Ryedale developed the design, andmanufactured and installed all the GRGworks that concealed the roof support steelwork to create a stunning new shopping centre. The project involved 4,000mof GRG cornice light troughs in 170 ceiling coffers; 1,000mof GRG large cornices and Greek key fascias inmalls and courtyards; GRGworks to a 30m x 18m central dome feature; 150 circular column casings with ionic angular voluted capitals; and about 200 different moulds. CONTRACT Barton Square, The Trafford Centre, Manchester ARCHITECT Leach RhodesWalker PLASTERING – FIBROUS AND GRG Ryedale Interiors ryedaleinteriors.co.uk CATEGORY SPONSOR The judges were highly impressed: “To take on a project of this magnitude and complexity required a huge degree of ingenuity, meticulous planning, high- quality workmanship, proactivity, value engineering and collaboration with all parties involved. The finished result is simply stunning and highlights the extraordinary work on all fronts that Ryedale executed throughout the contract.” CONTRACTORS AWARDS2021 GOLDWINNER

RkJQdWJsaXNoZXIy Mzg1Mw==