Modern Building Services
MODERN BUILDING SERVICES JUNE 2021 21 FEATURE COOLING & VENTILATION Remaining compliant Affecting older data centres with mechanical cooling systems, the 2020 F-Gas ban is a requirement of EU Regulation 517/2014 and means no refrigerants with a high global warming potential (GWP) can be used. Though many facilities may change over to a free cooled approach, older data centres with more equipment introduced than when they were first commissioned require refurbishment or replacement of aging infrastructure to be compliant. As Covid-19 may have disrupted maintenance schedules for data centres across Europe, it is imperative that cooling systems are compliant with regulations after any work is carried out. Continuing supply chain issues may mean that this process could be prolonged while waiting for equipment to arrive, leaving further possibility for equipment failure. Planning ahead For data centres, the huge cost and reputational damage that comes with periods of downtime means stringent planning for the mitigation of all potential pitfalls is vital. Specifying the right temperature control system can be a highly technical task, especially with variations in sizes and requirements of different data centres. With this in mind it is vital that a robust contingency plan with all of the intricate requirements is in place ready to implement when temperatures climb. This type of planning can be implemented by operators and providers to mitigate all potential pitfalls, from power outages to potential supply chain issues, and shortages of skilled workers. For cooling systems, a contingency plan will identify the temperature when the existing infrastructure will reach its limit so it is already known when temporary equipment is required. They also outline the level of supplementary cooling equipment required to keep optimal conditions in the server rooms – and determine whether additional power supply is required. Further to this, contingency plans outline how the equipment will be deployed on site (including any considerations for any obstacles that could prevent this) and where the equipment can be connected to the existing infrastructure. Companies such as Aggreko can send experts to the facility to work with the operators to work through the contingency plan, decide the equipment specification and identify the action plan should temporary cooling be required. Prepared for connection Given the fact that hot weather is often periodic, it may not be necessary for operators to invest into permanent cooling infrastructure, especially when consumption is under the microscope. For this reason, temporary cooling systems are a more practical way of mitigating heat as part of a contingency plan, only needing to be integrated when the hot weather hits. The quick mitigation of heat, however, is predicated on the ability to integrate the specified level of equipment with the existing infrastructure easily. For contractors and consultants, integrating accessible chiller stab-in points, which are tap ins for supplementary equipment to be attached to the cooling system in a data centre, is vital to this. In the best-case scenario, these can be implemented for a low cost during the facility’s construction phase. However, they can be retrofitted by drilling into the pipe and creating a tap off, however, this is a more expensive procedure. It also risks debris entering and circulating through the system. Putting this action in place during the construction stage reduces the cost and risk for operators later on, so represents a far safer and more reliable choice. If connections are not already in place, there could be a longer period to install an alternative solution in the server rooms themselves. These could also potentially be less efficient means of cooling and take up excess space inside the facility. However, if this is identified early on in the contingency planning stage, suitable and efficient equipment and where it should be implemented can be decided early on to avoid delays. For consultants and contractors, being able to make recommendations on ways to alleviate the effects of sudden heatwaves or extreme weather fronts is important. By advising and implementing methods of integrating supplementary cooling early on, building services professionals can help in avoiding downtime and added cost for their clients. Being sure of the facility’s demand, the weather patterns in its location and, crucially, consulting an expert of data centre temperature control will ensure such issues do not occur. More information can be found at www.aggreko.com/datacentre
Made with FlippingBook
RkJQdWJsaXNoZXIy Mzg1Mw==